PROJECT IGOR
================================================================================
MONTHLY EXAMINATION REPORT January 15, 2014
====================================================================================SUBJECT INFOName: Verduzco, Lars
DOB: 01/23/2007
Sex: M
Age: 7
Height: 134
Weight: 62
Room 143
Hallway B
--------------------------------------------------------------------------------
Significance Level (001-100) 100
--------------------------------------------------------------------------------====SUBJECT NOTESLast Updated 12/15/2013
--------------------------------------------------------------------------------
As of December 15th, 2013, all personnel were required to erase all past data on this field permanently.
Addendum: Any leakage of said data by any personnel will henceforth be punished by termination.
--------------------------------------------------------------------------------====PHYSICAL RESULTSBMI: 62.8
HR: 80
SP: 101
DP: 59
TMP: 67.6Eyes: Normal
Ears: Normal
Teeth: Normal
Genitals: Normal
Pain tolerance: (01-10) 05====PHYSICAL RESULTS (IGOR)HR: 102
Reaction Time (ms): 230
Strength: N/A
Sensitivity: (01-10) 08
Control: (01-10) 09====PHYSICAL NOTESLast Updated 01/15/2014
--------------------------------------------------------------------------------For personnel; Need more progress on flexibility and field-testing as IGOR grows older.--------------------------------------------------------------------------------====TEST RESULTSPhysical Response Test 100 PASSED
Emotional Response Test 100 PASSED
Physical Control Test 100 PASSED
Emotional Control Test 100 PASSEDSexual Response Test N/A N/AMinor Threat Response Test 100 PASSED
Life Threat Response Test 100 PASSED====TEST NOTESLast Updated 01/15/2014
--------------------------------------------------------------------------------
Sexual Response Test is bypassed during prepubescence.
Requested analyzation of following tests:
Suppression Test; Life Threat Response
All requests denied.No malfunctions or disturbances in behavior have been noted in Lars' personality.Lars' growing process has been doing very well. He will be let out and sent back to his family on 04/21/2014 after a few more tests, and will be brought back to the laboratory annually on the 23rd of January for examination. If any physical damage is dealt in the future, Lars should be immediately sent back to the laboratory for reconstructing. If any new info about this subject shall be added in the future, it should be submitted in the box below.
--------------------------------------------------------------------------------====EXTRA INFOLast Updated 03/24/2020
====================================================================================END OF REPORT===================================================================================